Procedures, floor plans, evacuation drills
Emergency Plan drafting, evacuation floor plans per UNI EN ISO 7010, annual evacuation drill scheduling and management, fire and first aid team training.
"In an emergency no one thinks straight: reflexes must take over. That's why evacuation drills matter."
What it is
The Emergency Plan describes how to behave in case of critical event: fire, explosion, earthquake, flood, gas leak, attack, hazardous spill, blackout, dangerous person.
Must contain: operating procedures per scenario, emergency call scheme, team composition (fire, first aid, evacuation), floor plans with escape routes and fire equipment, outside meeting points, periodic drill methodology.
Evacuation drill mandatory at least annually (6-monthly for high-risk activities).
Reference regulations
• D.Lgs. 81/08 art. 43: emergency management.
• D.M. 10/03/1998: general fire safety and emergency criteria.
• D.M. 02/09/2021 (in force 04/10/2022): new criteria for low/medium-risk fire activities.
• D.M. 03/09/2021 fire training update.
• UNI EN ISO 7010: safety symbol standards.
• D.Lgs. 105/2015 Seveso III plants.
Penalties: missing/inadequate plan = €1,200-5,200 fine + suspension; no evacuation drill = €2,500; untrained fire team = €2,000 per member.
Who needs it and when
For all companies with at least 10 workers (smaller ones can have simplified plans but still recommended).
Reinforced obligation for:
• Public-facing activities (restaurants, hotels, gyms, malls).
• Healthcare and RSA (non-self-sufficient guests).
• Schools (at least 2 drills/year).
• Major-risk activities (Seveso) or CPI-subject (Fire Prevention Certificate).
• Construction sites.
Update when: site changes, headcount doubles, new process introduced, fire classification changes.
Our approach
Emergency plan package:
• Site visit to map escape routes, fire equipment (extinguishers, hydrants, hose reels, sprinklers, smoke vents), meeting points, critical scenarios specific to the activity.
• Written plan drafted + printable quick procedures per team.
• UNI EN ISO 7010 floor plans in Illustrator/PDF and laminated paper ready to display.
• Fire team training (low/medium/high risk) and first aid (group A/B/C) at client or our site.
• Annual assisted evacuation drill with minutes (clearance time and debrief included).
• Photo report post-drill with improvement points.
In case of real emergency: phone availability to coordinate with fire dept/118 and produce required documentation.
Want to be compliant without worries?
Free site visit, transparent quote within 48 working hours, ongoing support with digital deadline tracker.
● Consultation request
Let's talk.
Fill in the form: a technician will get back to you within 24 working hours with an initial assessment and an indicative quote.
Via degli Artigiani 27
Via degli Artigiani 27 — 50055 Lastra a Signa (FI), Italy